Industrial Waste – Classifiion for drilling mud
if the drilling mud is stored at a Consolidation Site prior to dewatering, the waste must be transported to the dewatering facility within 30 days from when the first load of drilling mud was received at the Consolidation Site; following dewatering, the solids must not contain free liquid as determined by method 9095B "Paint